







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Schluter Home Additions & ADU: The Long Beach Owner’s Guide
If you’re planning a home addition or ADU in Long Beach and want Schluter waterproofing and uncoupling systems in the build, the installed cost typically runs $45,000 – $130,000 for the addition itself, with Schluter materials like Kerdi-Board, Kerdi-Shower kits, and Ditra accounting for roughly $1,800 – $6,500 of the materials budget depending on wet-area square footage. Most Long Beach homeowners discover they need Schluter-compatible work mid-project, when an existing shower pan membrane has failed, a tile floor is cracking over a slab, or a building inspector has flagged the waterproofing detail on an ADU bathroom. When that happens, the question isn’t whether Schluter is the right call; it’s whether the person installing it knows the difference between the right thinset and the wrong one, and whether the price was written down before the first cut. Graham Stein and our crew have been remodeling Long Beach homes for well over a decade, and we stock Schluter Kerdi and Ditra materials on our trucks for exactly these conversations.

Key Takeaways:
- Schluter is a waterproofing and uncoupling system, not a structural product; it protects the shell of your Long Beach addition or ADU.
- Installed Schluter work inside a larger addition runs $1,800 – $6,500 for wet areas, but the full project range is $45,000 – $130,000.
- The most common Schluter failure we see in Long Beach is improper thinset choice, not a product defect.
- We write the price down before work starts, and we answer the phone live when you call (562) 512-7086.
Which Schluter Models This Applies To
Schluter makes several waterproofing and uncoupling systems, and the right one depends on where in your Long Beach addition or ADU it’s going. Kerdi-Board is the foam backer we use for shower walls and tub surrounds in ADU bathrooms; it comes in thicknesses from 3/16 inch up to 2 inches, and the 1/2-inch panel is what we spec for most residential wet walls. Kerdi-Shower kits (the prefabricated tray, curb, and membrane) match specific drain locations, so measure the drain offset from the wall before you order anything; a center-drain tray won’t fit a linear drain rough-in without field modifications. Ditra and Ditra-Heat are the uncoupling membranes that go under tile floors, and the compatibility gotcha most homeowners miss is that Ditra requires a modified thinset below the membrane and an unmodified thinset above it; using a modified thinset on top is the single most common cause of tile tenting and cracked grout we’re called to fix in Long Beach. For DIYers buying their own materials, check the orange label on the roll end for the product series and batch date; we can match it to the spec sheet. Aftermarket equivalents exist, but Schluter’s warranty only travels if the entire system, membrane, band, corners, and drain, is Schluter product installed per their published methods. We’re an independent contractor in Long Beach, not affiliated with Schluter, but we install to their specs every time because the system works when the installer follows it.
Styles & brands we work with






Signs Your Schluter Home Additions & ADU Is Failing
- Grout cracks along the shower floor perimeter. This usually means the substrate under the tile is flexing, often because the Kerdi tray was set over an unlevel subfloor or the wrong thinset was used. The crack is a symptom; the waterproofing under it may already be compromised.
- Musty odor in an ADU bathroom that won’t clear. When water gets behind Kerdi-Board through an unsealed pipe penetration or an improperly lapped seam, it soaks into framing and drywall. By the time you smell it, the repair is a gut, not a patch.
- Tile floor feels hollow when tapped. A hollow sound means thinset has lost its bond, typically from a modified thinset applied over Ditra where an unmodified was required. The membrane itself may be fine; the tile assembly on top is what has failed.
- Water staining on the ceiling below an upstairs addition bathroom. This is the clearest sign, and the one we take most seriously. In a two-story Long Beach addition, a failed shower pan shows up downstairs before the homeowner ever sees a crack upstairs.
- ADU inspector flags the waterproofing detail. Long Beach building inspectors know Schluter specs. If your inspector won’t sign off on a Kerdi corner or a curb detail, the fix often requires removing tile and redoing the membrane, which is why we encourage having the waterproofing inspected before the tile goes on.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
A full Schluter system replacement inside a Long Beach bathroom or ADU wet area runs $3,000 – $8,500 for the waterproofing scope, depending on shower size, drain location, and whether the tile is coming out or being left in place. Replacing a failed Kerdi shower pan alone is usually $2,500 – $6,000 including the new tray or mud bed, membrane, drain assembly, and tile re-set. The broader home addition range on this page, $45,000 – $130,000, covers the full build; Schluter materials are a line item inside that scope, and we write them out that way so you can see exactly what the orange material costs. What drives the Schluter-specific range: shower footprint, linear drain versus center drain (linear drains add $300 – $1,200), number of wall panels, and whether your Long Beach home is on a slab or raised foundation. Every quote includes the parts, the thinset, the labor, and our 365-Day Done Right Promise: if the waterproofing isn’t done right, we make it right. The price I write down on day one is the price on the invoice when we’re done.
DIY or Call Us?
What you can safely check before calling: whether the grout is cracked, whether the tile sounds hollow, whether the drain gasket has visible silicone gaps, and whether water beads on the Kerdi surface or soaks in. Those observations help us quote the job over the phone. What you should not do is pull up tile or cut into a Schluter membrane to “find the leak.” Once the waterproofing layer is compromised by amateur investigation, the repair scope grows from a targeted fix to a full pan replacement, and the cost moves with it. Schluter installation isn’t dangerous in the way a garage-door spring is, but incorrect thinset choice or a bad corner lap will fail silently until the water damage is extensive. We’ve torn out dozens of DIY Kerdi jobs in Long Beach that looked fine for a year and then ruined a subfloor in a month. If you’re holding a quote from a contractor who can’t tell you which thinset goes where, put the checkbook down and call us at (562) 512-7086.
FAQs

Schluter membranes are engineered to last the life of the tile assembly when installed to spec, typically 30 – 50 years in Long Beach’s moderate coastal climate, where humidity and salt air accelerate corrosion of metal components but have little effect on the polyethylene membrane itself. The point of failure is almost always installation, not the product.
In most cases, no. Once water has migrated past the membrane seam or through a compromised corner, the only reliable fix is removing the tile and replacing the affected waterproofing layer. A patch over a failed lap will fail again within months, and by then the framing damage is worse. Call (562) 512-7086 if you suspect a pan leak; the earlier we open it up, the smaller the repair.
A full Schluter shower pan and wall replacement takes 3 – 6 working days in a typical Long Beach ADU bathroom, including tile removal, subfloor repair if needed, membrane installation, flood testing, and tile re-set. The flood test itself requires 24 hours of standing water before we proceed to tile.
Yes. Our Long Beach crew trucks carry Kerdi membrane rolls, Kerdi-Band, inside and outside corners, Kerdi-Fix sealant, and Ditra in the most common widths, so we can begin most waterproofing repairs the same day we diagnose them. If your project needs a custom tray or linear drain, we order it from our local Schluter distributor for next-day pickup in most cases.
When you’re ready to get a written price for Schluter work in your Long Beach home addition or ADU, call (562) 512-7086. We answer live, we show up with shoe covers and drop cloths, and the estimate is free, always. Ask for Graham when you call; he’s the one who will walk your wet areas, point at the grout line, and tell you exactly what he sees.
Written by Graham Stein, Owner, Elmstead Remodeling Long Beach at Elmstead Remodeling Long Beach, serving Long Beach and nearby areas.


